Adelbert Bridge
Adelbert Bridge carries Adelbert Road over the railroad tracks. It is the primary connection between the South Residential Village and the rest of campus.
Adelbert Bridge was closed to vehicular traffic throughout 2005 due to being deemed unsafe. It was demolished and in early 2006, construction of a replacement bridge began. A temporary footbridge allows pedestrians to cross during construction. Drivers must use an alternate route, usually the Cornell Road bridge.
Adelbert Bridge in late 2005, shortly before demolition.
Construction of new Adelbert Bridge in April 2006.
